C583

Project: Emissions of a Flywheel Power Generation Unit

Timeline: 2 working days

Scope of work:

  • Regeneration unit Choke Cover Design.
  • Initial Panel Design Consultancy.
  • Offer consultancy on component placement, cable selection, shielding, etc..
  • System Consultancy.
  • The remaining time should be spent evaluating the full system as built and offering any last recommendations before final testing.
This work involves the design of a shielded box for low-frequency EMI noise
Pre-compliance Radiated Emission Check